Certificate | CE ,ROHS ,LFGB german food grade | Power supply | 220/110V,50/60HZ |
Protection of over/low of voltage/current | |||
Power consumption | 1.85KW | Compressor | Embraco aspera/panasonic |
Refrigerant | R404A/R410A/R22 | Condenser | Air |
Production capacity | 23L/H | Hopper volume | 8.6L*2 |
Cylinder volume | 2.1L*2 | Flavors | 2 + mixed |
Stainless steel(all machine)/LED/digital control panel/Full auotmatic production/Restart auotmatically/Counter system | |||
N.W/G.W | 120/155 KGS | Machine size | 670*550*1360(H)MM |
Packing size | 840*680*1450(H)MM | Package | Plywood case |
Original | China | MOQ | No |
Delivery time | 7-10 working day | ||
Optional installation | Precooling system/Air pump/Low mixed alarm/Syrup system/Agitator | ||
LFGB Germany Food Grade Request approved,it ensure ice cream is clean and healthy. |
1. What is the MOQ of the bakery machinery?
1 set.
2. what is the grantee period?
The ordinary type is 12 months, and the luxury type is 24 months, and if any components damaged
in grantee period, we will send same free components by air and will guide for installation.
3. Do you supply overseas installation? How many days you need?And what about the charge?
Yes, we are sure to supply overseas installation. Generally, whole production line installation will
need about 7 days. And the customer should charge for the visa, the air tickets, the
accommodation and the salary.
4. What about the packing?
After finishing the production, we will clean and packed it before it is qualified by the QC manager.
First we will put drying desiccant inside the machine (protect the machine from wet damage
during the transportation), then put 6mm cystosepiment outside it and upgrade the thermal
contracting film.
Finally we will put wooden case and steel belt. We will upgrade again according to different
machine to protect the damage of the machine before loading the container.
Wooden Case Packing accord with export standard. After inspection by the quality control department, passing inspection, the machine comprehensive clean-up, and then start packing. First desiccant is placed in the machine And then around the machine with 6 cm thick foam board, winding stretch film for reinforcement, and then add the bubble film. Machine packed in wooden case, and then the metal strip reinforcement. Product packed in containers, depending on the product to be reinforced.
Copyright © 2021 Guangzhou Weyes Network Technology Co., Ltd. | All Rights Reserved